Rehabilitation and periodic maintenance or strengthening works of the Machakos Turnoff-Ulu-Sultan Hamud Road (A109), Nairobi-Limuru–Kamandura-a Road (C62), and the Thika-Kamae-Magumu Road (C66).








- N/A






Poor road conditions have been a major obstacle for development in Kenya. In view of this, the Ministry of Roads and Public Works, Government of Kenya (GoK) with funding from the World Bank, contracted Norconsult A.S. Kenya for the Preliminary Design, Feasibility Study, Detailed Engineering Design and Contract Documentation for the Rehabilitation and Periodic Maintenanice and Strengthening of Works on three roads. One of the objectives of the study was to identify the most appropriate economically justified rehabilitation and periodic maintenance or strengthening solutions for each of the study roads.


- Inglês


- Nenhuma restrição


- Outra biodiversidade terrestre


- Avaliação do Impacto Ambiental, Planos de Gestão Ambiental, Planos de Contrabalanços da Biodiversidade, e afins


- Avaliação de impactos


- Nenhuma / Não aplicável



Descarregar