Rehabilitation and Periodic Maintenance Or Strengthening Works of the Machakos Turnoff – Ulu – Sultan Hamud Nairobi – Limuru – Kamandura And Thika – Kamae – Magumu Roads (A109/C62/C66)
- N/A
One of the objectives of the study was to identify the most appropriate economically justified rehabilitation and periodic maintenance or strengthening solutions for each of the study roads. This environmental study is part of the preliminary feasibility study on three project roads: the Machakos Turnoff-Ulu-Sultan Hamud Road (A109), Nairobi-Limuru-Kamandura Road (C62), and the Thika-Kamae-Magumu Road (C66).
- Inglês
- Nenhuma restrição
- Outra biodiversidade terrestre
-
- Avaliação de impactos
- Nenhuma / Não aplicável
Descarregar