Detailed engineering design and contract documentation for the rehabilitation and periodic maintenance or strengthening of the works of the Lanet-Nakuru-Mau Summit-Timboroa and Nakuru-Magotio roads








- N/A






This working paper is presented in accordance with the Terms of Reference for the design of the Lanet - Nakuru - Timboroa Road (98 km) and the Nakuru - Mogotio (38 km) Road. It presents the investigations and findings of the environmental impact assessment (EIA) and appropriate mitigation and support measures for the project. This report should be read in conjunction with Working Paper 1A, Traffic Studies, Working Paper No 1B, Axle Load Studies, Working Paper 2, Condition Survey of Structures & Drainage Systems, Working Paper 3B, Hydrological Studies and Working Paper 4, Preliminary Materials Investigation.


- Inglês


- Nenhuma restrição


- Outra biodiversidade terrestre


-


- Avaliação de impactos


- Nenhuma / Não aplicável



Descarregar