Beatrice Wind Farm Demonstrator Project
- N/A
During June 2007, we have been preparing the second turbine for load-out from Nigg and installation on site in the Beatrice Field in July. With both turbines scheduled to be operational in autumn 2007, the Beatrice Wind Farm Demonstrator will begin to provide in-depth data. However, we have already learned a lot since the project commenced in 2003; we have pioneered the use of large turbines and jackets offshore; we have shown that large turbines can be pre-assembled onshore, transported to the site as a complete unit, and installed in a single operation; and we have set new standards in the environmental management of large scale developments in sensitive marine environments.